欧美成人影院亚洲综合图,亚洲午夜福利精品无码不卡,国产成人精品日本亚洲,午夜小视频在线,国产视频 第一页,中文字幕丝袜一区二区,男女性午夜福利网站,丰满人妻久久中文字幕

400-6388-667Food/Pharmaceutical/Cosmetic/Mechanical domain experts

homeother product details

Stainless steel gas stove pot large cooker wok gas food mixing pot

Release date:[2017-03-11]     Click rate:

main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.


overview
parameter

Gas sandwich pot with a large heating area, high thermal efficiency, heating evenly, material boiling time is short, easy to control the heating temperature and so on.


main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.

skills:

1, remove the heater, put the gas fire cover.

2, open the valve and intake interface.

3, counterclockwise to open the valve, open fire lit. (With a fire stove please ignite the fire).

4, while adjusting the throttle and valve switch, until the required flame.

5, stop working, close the angle valve and valve.

Precautions:

1, regularly check the sealing of the joints.

2, regularly check the stove, forbidden dirt to plug the stove plug.

3, when the first tilt when the steam, after the speed control switch.

maintenance:

1, into the steam pipe and outlet pipe leakage, elected tight nuts do not solve the problem, you should add or replace the filler.

2, the pressure gauge and safety valve should be regularly checked, if the failure of timely replacement and repair.

3, the gear box to start using after 50 hours, should be removed to let go of lubricants, rinse with kerosene or diesel, add 30 # - 40 # clean oil, use 150 hours after the second oil change, after the specific circumstances , Each used to 1000 hours or so oil change once.

4, anti-rust oil peeling, should be timely brushing, painted outside the pot of paint, it is recommended to use X55-3 aluminum powder water resistant paint.

5, the pot used after 5 years, the proposed safety of water pressure test, after the interval of water pressure test, according to the requirements of technical departments around. Water pressure test pressure P water according to the following circumstances: When the rated working pressure P <0.6MPa, P water = 0.15MPa; when the rated working pressure P = 0.6-0.8MPa, P water = P + 0.3MPa

6, the pot outside the pot body using 4.0 ~ 5.5 mm thick steel plate manufacturing, steel A3, when the outer pot after years of corrosion reduced to 2mm below, should stop using. 7, the pot of stainless steel welding and other stainless steel welding joints, should be used stainless steel electrode 102, Austrian 107, Austria 132, Austria 137, should not use other grades.

Use Note:

1, should use liquefied petroleum gas, pipeline gas, natural gas and other fuels, prohibited the use of oil;

2, connected to the stove hose and the furnace end and the valve end to be tightened, and should be naturally under the stove surface sagging, and maintain the distance of 10 cm or more, so as not to be fire scorched, resulting in an accident;

3, do not install the gas heating sandwich pot in the room, and then use the coal stove, liquefied petroleum gas or other stoves;

4, gas heating around the sandwich pan do not stack flammable items;

5, with the gas field must ensure that spacious and well ventilated;

6, gas heating sandwich pan when the ignition gas to be someone to take care of;

7, people go to turn off;

8, found that leakage or abnormalities to quickly close the valve to open the doors and windows ventilation;

9, before the break to check the gas valve and the front of the switch is closed.

Installation procedures:

1, tighten the bracket of the two set screws, shake the pot body, both ends of the inlet pipe and outlet pipe is not allowed to rotate with the pot.

2, the installation is completed, the mixing-type sandwich pot, should be empty test run test, until the transmission parts of the normal operation before they can be put into use.

3, after the air, such as joints at the leak, you can tighten the nut until the leak so far.


Contact us

Learn more about our detailed information, please contact
400-6388-667

Or leave a message to us

主站蜘蛛池模板: 欧美a级完整在线观看| 国产人人干| 99在线免费播放| 亚洲无码日韩一区| 经典三级久久| 91亚洲视频下载| 成人a免费α片在线视频网站| 国产av无码日韩av无码网站| 国产午夜无码片在线观看网站| 国产日本一线在线观看免费| 99在线视频精品| 亚洲无线视频| 91久久精品国产| 亚洲婷婷六月| 欧洲成人在线观看| 国产爽歪歪免费视频在线观看| 久久国产精品电影| 国产玖玖视频| 暴力调教一区二区三区| 99草精品视频| 色亚洲激情综合精品无码视频| 亚洲自偷自拍另类小说| 3D动漫精品啪啪一区二区下载| 精品人妻无码区在线视频| 91国内在线观看| 91精品伊人久久大香线蕉| 精品久久综合1区2区3区激情| 国产人碰人摸人爱免费视频| 综合亚洲色图| 91在线精品麻豆欧美在线| 91精品视频网站| AV在线天堂进入| 亚洲第一成年免费网站| 国产一区二区影院| 伊人久久大香线蕉影院| 99国产精品国产高清一区二区| 激情爆乳一区二区| 久久99国产综合精品1| 福利一区三区| 成人免费黄色小视频| 欧美午夜小视频| 青青草综合网| 伊人久久综在合线亚洲2019| 亚洲第一香蕉视频| 操美女免费网站| 国产午夜人做人免费视频中文| 三上悠亚精品二区在线观看| 日韩视频免费| 国产高潮流白浆视频| 日韩a级毛片| 国产大片喷水在线在线视频| 国产精品久久久久鬼色| 综合色88| 91福利一区二区三区| 五月天婷婷网亚洲综合在线| av一区二区无码在线| aⅴ免费在线观看| 亚洲欧美不卡视频| 婷婷午夜天| 狠狠综合久久久久综| 人妻21p大胆| 精品无码一区二区三区电影| 久久免费视频6| 国产男人的天堂| 乱码国产乱码精品精在线播放| 亚洲欧美日韩动漫| 日韩欧美国产区| 亚洲色图另类| 青青青国产视频| 亚洲成a人在线播放www| 国产一级二级三级毛片| 国产成人精品一区二区不卡| 中文字幕在线看| 国产粉嫩粉嫩的18在线播放91| 欧美成人综合视频| 欧美高清三区| 成人亚洲视频| 欧美成人综合视频| 国产成人高精品免费视频| 婷婷色一区二区三区| 亚洲高清无在码在线无弹窗| 国产啪在线|