欧美成人影院亚洲综合图,亚洲午夜福利精品无码不卡,国产成人精品日本亚洲,午夜小视频在线,国产视频 第一页,中文字幕丝袜一区二区,男女性午夜福利网站,丰满人妻久久中文字幕

400-6388-667Food/Pharmaceutical/Cosmetic/Mechanical domain experts

homeother product details

Stainless steel gas stove pot large cooker wok gas food mixing pot

Release date:[2017-03-11]     Click rate:

main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.


overview
parameter

Gas sandwich pot with a large heating area, high thermal efficiency, heating evenly, material boiling time is short, easy to control the heating temperature and so on.


main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.

skills:

1, remove the heater, put the gas fire cover.

2, open the valve and intake interface.

3, counterclockwise to open the valve, open fire lit. (With a fire stove please ignite the fire).

4, while adjusting the throttle and valve switch, until the required flame.

5, stop working, close the angle valve and valve.

Precautions:

1, regularly check the sealing of the joints.

2, regularly check the stove, forbidden dirt to plug the stove plug.

3, when the first tilt when the steam, after the speed control switch.

maintenance:

1, into the steam pipe and outlet pipe leakage, elected tight nuts do not solve the problem, you should add or replace the filler.

2, the pressure gauge and safety valve should be regularly checked, if the failure of timely replacement and repair.

3, the gear box to start using after 50 hours, should be removed to let go of lubricants, rinse with kerosene or diesel, add 30 # - 40 # clean oil, use 150 hours after the second oil change, after the specific circumstances , Each used to 1000 hours or so oil change once.

4, anti-rust oil peeling, should be timely brushing, painted outside the pot of paint, it is recommended to use X55-3 aluminum powder water resistant paint.

5, the pot used after 5 years, the proposed safety of water pressure test, after the interval of water pressure test, according to the requirements of technical departments around. Water pressure test pressure P water according to the following circumstances: When the rated working pressure P <0.6MPa, P water = 0.15MPa; when the rated working pressure P = 0.6-0.8MPa, P water = P + 0.3MPa

6, the pot outside the pot body using 4.0 ~ 5.5 mm thick steel plate manufacturing, steel A3, when the outer pot after years of corrosion reduced to 2mm below, should stop using. 7, the pot of stainless steel welding and other stainless steel welding joints, should be used stainless steel electrode 102, Austrian 107, Austria 132, Austria 137, should not use other grades.

Use Note:

1, should use liquefied petroleum gas, pipeline gas, natural gas and other fuels, prohibited the use of oil;

2, connected to the stove hose and the furnace end and the valve end to be tightened, and should be naturally under the stove surface sagging, and maintain the distance of 10 cm or more, so as not to be fire scorched, resulting in an accident;

3, do not install the gas heating sandwich pot in the room, and then use the coal stove, liquefied petroleum gas or other stoves;

4, gas heating around the sandwich pan do not stack flammable items;

5, with the gas field must ensure that spacious and well ventilated;

6, gas heating sandwich pan when the ignition gas to be someone to take care of;

7, people go to turn off;

8, found that leakage or abnormalities to quickly close the valve to open the doors and windows ventilation;

9, before the break to check the gas valve and the front of the switch is closed.

Installation procedures:

1, tighten the bracket of the two set screws, shake the pot body, both ends of the inlet pipe and outlet pipe is not allowed to rotate with the pot.

2, the installation is completed, the mixing-type sandwich pot, should be empty test run test, until the transmission parts of the normal operation before they can be put into use.

3, after the air, such as joints at the leak, you can tighten the nut until the leak so far.


Contact us

Learn more about our detailed information, please contact
400-6388-667

Or leave a message to us

主站蜘蛛池模板: 国产精品制服| 国产精品无码AⅤ在线观看播放| 亚洲码在线中文在线观看| 亚洲国产成人无码AV在线影院L| 精品一区二区三区四区五区| 亚洲系列无码专区偷窥无码| 亚洲国产欧美国产综合久久 | 精品人妻无码中字系列| 国产精品尤物在线| 久精品色妇丰满人妻| 久久综合色播五月男人的天堂| 影音先锋丝袜制服| 国产美女91视频| 欧美精品成人| 在线精品自拍| 中美日韩在线网免费毛片视频| 色欲色欲久久综合网| 欧美日韩福利| 国产成人综合网在线观看| AV网站中文| 国产a网站| 不卡无码h在线观看| a毛片免费观看| 久久情精品国产品免费| 国产菊爆视频在线观看| a级毛片免费网站| 精品一区二区无码av| 欧美另类视频一区二区三区| 国产精品久久自在自线观看| 国产女人18毛片水真多1| 人人91人人澡人人妻人人爽| 日韩美毛片| 国产免费黄| 亚洲欧州色色免费AV| 日韩精品视频久久| 又黄又爽视频好爽视频| 久久综合九色综合97网| 免费一级全黄少妇性色生活片| 久久福利网| 无码啪啪精品天堂浪潮av| 亚洲色图欧美视频| 久视频免费精品6| 91在线一9|永久视频在线| 免费亚洲成人| 欧美成人亚洲综合精品欧美激情| 无码久看视频| 欧美日本不卡| 国产成人精品无码一区二| 久久精品亚洲中文字幕乱码| 久久久久无码精品| 91视频日本| 日韩高清无码免费| 中国黄色一级视频| 亚洲三级a| 久久精品人人做人人综合试看| 国产成人AV综合久久| 欧美啪啪网| 国产一区二区人大臿蕉香蕉| 一本二本三本不卡无码| 无码一区18禁| 亚洲男人的天堂久久香蕉| 日韩一级毛一欧美一国产| 狠狠综合久久| 99久久精品国产综合婷婷| 亚洲精品动漫| 国产爽歪歪免费视频在线观看| 亚洲免费黄色网| 日韩欧美亚洲国产成人综合| 免费三A级毛片视频| 色悠久久综合| 亚洲成人网在线播放| 国产一级α片| 8090午夜无码专区| 美女毛片在线| 美女扒开下面流白浆在线试听 | 亚洲欧美在线综合图区| 日本在线视频免费| 日韩欧美国产另类| 国产精品免费入口视频| 1024国产在线| 亚洲视频在线网| 一级毛片不卡片免费观看|